Study of Cost and Construction Speed of Cladding Wall for Lightweight Steel Frame (LSF)

Open

Try Ramadhan, Beta Paramita, Ravi Shankar Srinivasan

2022 Buildings Vol. 12 Issue 11 Article Cited by 6 SDG 11SDG 17 Quartile

Abstract

The strategic issue faced by the Ministry of Public Works and Housing, Republic of Indonesia (PUPR) is the large housing backlog, especially in the urban areas. Low-income communities earning less than 2 USD/day are found as the most vulnerable to lack of access to affordable housing. This experiment aims to find an alternative solution on building construction material in accordance with the Ministry of Public Housing regulation No. 11 of 2011 about affordable housing guidelines. The experiment was carried out on an LSF to compare four different wall cladding materials. The building area was 36 m2 and the total wall cladding area was 95 m2. The wall cladding materials used were metal sheet, lightweight concrete brick, gypsum reinforced cement (GRC) board, and unplasticized polyvinyl chloride (uPVC) fiber. The experiment collected data on purchases of materials to develop the S-curve and measure construction progress. Then, the work unit price analysis (WUPA) approach was carried out to simulate the labor coefficient of construction speed and its comparison to the material costs of the four wall cladding materials. The experiment on this 36 m2 house found that metal sheet is the most efficient material, which took 22.7 h to cover a 95 m2 wall. Later, it was followed by uPVC fiber with 46.6 h, GRC board with 59.7 h, and finally lightweight con-bricks with 85.7 h. Apparently, the metal sheet not only presented the most efficient construction time, but also provided the lowest construction cost with 115.960 IDR/m2 (8.24 USD/m2). It was followed by uPVC fiber at 133.37 IDR/m2 (9.48 USD/m2); GRC board at 146.91 IDR/m2 (10.44 USD/m2) and finally lightweight con-bricks at 156.88 IDR/m2 (11.15 USD/m2). Through WUPA, this study also found that efficient workmanship (construction speed) of the labor greatly affects construction costs. © 2022 by the authors.

Affiliations

Architecture Study Program, Faculty of Technology and Vocational Education, Universitas Pendidikan Indonesia, Setiabudi 229, Bandung, 40152, Indonesia; School of Construction Management, University of Florida, Gainesville, 32611, FL, United States

Research at a Glance

Premium content — register to unlock

Research at a Glance

Register to unlock

Topics & SDG Alignment

Premium content — register to unlock

Topics & SDG Alignment

Register to unlock

Collaboration

Premium content — register to unlock

Collaboration

Register to unlock

Author Profile (Selected)

Premium content — register to unlock

Author Profile (Selected)

Register to unlock

References Overview

Premium content — register to unlock

References Overview

Register to unlock

Journal & Source

Premium content — register to unlock

Journal & Source

Register to unlock

Metadata & Integrity

Premium content — register to unlock

Metadata & Integrity

Register to unlock