M.F. Affan, A.G. Abdullah, W. Surya
Wind energy is an environmentally and efficient energy source that is popular. Wind energy can be converted into electrical energy to meet the electricity needs of the community. This research presents results of Bandung's wind speed forecasting for the next 5 years which aims to determine the wind speed potential in Bandung and plan for the application of a power plant to meet the electricity needs of community, using Exponential Smoothing and Artificial Neural Network (ANN) methods), simulation process of the calculation use Zaitun time-series software. Based on simulation results forecasting value with the least error value is obtained using the Artificial Neural Network (ANN) method. The results of the study determined that the city of Bandung was not suitable for the establishment of a wind power because it did not meet minimum wind speed limit suitable for a wind power. © Published under licence by IOP Publishing Ltd.
Department of Electrical Engineering, Universitas Pendidikan Indonesia, Jl. Dr. Setiabudhi 229, Bandung, 40154, Indonesia
Research at a Glance
Register to unlockTopics & SDG Alignment
Register to unlockCollaboration
Register to unlockAuthor Profile (Selected)
Register to unlockReferences Overview
Register to unlockJournal & Source
Register to unlockMetadata & Integrity
Register to unlock